The project
Project management, installation, content strategy and content production.
In reception, 7 55” OLED screens were installed and in the main lobby 85″ LG Stretch screens were integrated in vertical 7×3 and another complete structure of 85″ 6×5.


The challenge
The challenge was to coordinate the installation in a large environment and generate a content strategy that integrated valuable information from Torre Mapfre with relevant content, connecting with tenants and visitors.
